A mechanical edge of dock leveler is a piece of loading equipment installed at the edge of a warehouse loading dock. It is primarily designed to bridge the height difference between the dock and a truck trailer, enabling forklifts, pallet jacks, and other handling equipment to move cargo between the dock and the vehicle safely and efficiently.
The key feature of a mechanical edge-of-dock leveler is that it requires neither an external power supply nor a hydraulic system; instead, it utilizes a configuration of mechanical springs, levers, and a lip plate to facilitate the raising, lowering, and bridging of the platform.
Product | Mechanical edge of dock leveler | |
Product model | MEOD | |
Size range | Width 1830~2130mm Length 660mmHeight 200mm | |
Standard size | Width 1830mm Length 660mmHeight 200mm | |
Dynamic load | 3tons | 6tons |
Swinging Lip | 14mm thickness | 16mm thickness |
Upper Plate | 8mm thickness | 10mm thickness |
Working Range | - 120mm / + 120mm | |
Material | Q345 Alloy Steel | |
Connection Axis | Shaft diameter: 20 mm | |
Connection Hinge | 12mm thick hinge (Open Hinge) | |
Surface Treatment | Sandblasting and then powder-coated | |
Anticollision Block | Standard | |
Open method | Manual | |
Color | Blue,Grey,Black,other customization options are available. | |
Country of origin | China | |
Brand | Master Well | |
No Pit Required: Eliminates the need for a pre-constructed pit, reducing installation and renovation costs.
No Power Required: Operates without an external power supply, saving energy.
Spring-Assisted Operation: Features a mechanical spring-assist system for easy manual operation.
Space-Saving Design: Compact construction helps conserve space on the loading dock.
Cost-Effective Solution: An economical, practical choice ideal for standardized loading docks.
Mechanical edge of dock levelers are well-suited for the following environments:
1. Small to medium-sized warehouses: Where daily cargo handling volumes are moderate, eliminating the need for large-scale hydraulic dock levelers.
2. Logistics distribution centers: Where truck bed heights are relatively uniform, sufficient to meet standard loading and unloading requirements.
3. Manufacturing facilities: Used for the loading, unloading, and transport of raw materials and finished goods.
4. Standardized loading docks: Where the height difference between the dock platform and the truck bed is minimal.
Packing Material | PE film on the surface with bubble wrap and carton sheet for protection |
Packing Size | One pallet W1370XL1900XH2170mm |
Loading Capacity | For 1830x660x200mm, 12sets / pallet |
Established in 2009, Master Well is a manufacturing enterprise based in Wuxi, in southeastern China. We specialize in the field of automatic doors, windows, and loading dock equipment. Backed by strong R&D capabilities and an excellent track record, we have earned a global reputation for providing high-quality, cost-effective products and professional technical services to a diverse range of clients. Each year, We Master Well exports its products to over 60 countries, with an annual export value reaching tens of millions of US dollars. Our core product offerings include loading dock levelers, dock seals and shelters, industrial doors, high-speed doors, and garage doors.
A: Mechanical dock levelers operate via torsion springs and are manually controlled; they require no electricity and are more cost-effective. Hydraulic dock levelers utilize electric-hydraulic cylinders and are operated via push buttons, making them ideal for high-frequency daily use.
No. These dock levelers are designed for surface mounting—they are fixed directly to the edge of the loading dock, eliminating the need for a pit.
A: There is no minimum order quantity for our dock levelers.
A: Certainly. We offer a variety of solid colors via a powder-coating process (subject to a minimum order quantity). Please consult our sales team for further details.
A: Yes. Our engineers will review your project drawings to ensure that all components and quantities are accurate.
A: Pricing depends on the dock dimensions, load capacity, color, and order quantity. Please feel free to contact our sales team to request a quote.
A: We generally accept payments via bank transfer (T/T), credit card, etc. Please discuss any other payment requirements with us.
A: Installation is straightforward; it requires only bolting—no welding is necessary. We can provide installation videos, and on-site installation guidance is also available if needed.
A: Yes, we offer comprehensive loading dock solutions. In addition to dock levelers, we manufacture dock seals/shelters, high-speed doors, spiral roll-up doors, and industrial sectional overhead doors.
A: The lead time is approximately 25–35 business days.